telefon +36 74 550 540
telefon info@knipl.com
Facebook
Twitter
Tweets by KniplKft
Youtube
Blogger

The wastewater treatment occurs continuously. This system can be used in case of higher wastewater volumes. The treatment process takes place in separate units. The chemical process happens in 3 reactors, the settling process in the settling unit. The treated wastewater can be led into a tank, after the end control procedure, according to the requirements into the canalization. The pressed and dried sludge can be removed easily from the settling unit by means of sludge press.

« Back